News

Co-op is testing the power of wind

A local cooperative is testing the water for wind power, and will loan its tester out to co-op members when it is done.

"We’re doing this to educate the members," said Rollie Miller of Hill County Electric Cooperative.
Hill County Electric installed an anemometer next to its office west of Havre on Dec. 11 to measure the wind. Miller said that after the wind is measured at the site for nine to 12 months, the co-op will decide whether to install a turbine to provide power at the office.

Once the co-op is done testing the wind, it will loan the anemometer out to its members so they can test the wind on their properties, Miller said.

By Tim Leeds/Havre Daily News/[email protected]

Full Story: http://www.havredailynews.com/articles/2004/12/23/local_headlines/windpower.txt

Sorry, we couldn't find any posts. Please try a different search.

Leave a Comment

You must be logged in to post a comment.